Assembly shop
Used to manufacture complex devices from parts produced at the
Factory. Production requires parts and a model of the device being made. Models are purchased or copied in the
Laboratory. Each device requires production time.
With each upgrade level the number of device production cycles increases. Initial level: 1 cycle; maximum level: 10 cycles. Continuous production requires autonomous robots and an Earth Confederation license.
Warehouse for minerals and manufactured parts: 5000
Initial construction time: 420 seconds; reduced when studying the Builder science
Construction requires:
Factory
Building warehouse:
5000
Energy:
-70
Object mass: 100000